As of 30 June 2021, environmental energy had invested in 217 projects, commanding a total investment of approximately RMB86.792 billion, and undertook 1 O&M project. These projects are designed to have an annual household waste processing capacity of 49,019,500 tonnes, which is expected to generate annual on-grid electricity of 16,482,010,800 kWh, an annual food and kitchen waste processing capacity of 2,131,600 tonnes, an annual sludge treatment capacity of 321,200 tonnes, and an annual medical waste processing capacity of 10,950 tonnes.
Projects in Operation
Project | Average Annual Electricity Generation (kWh) |
Total Investment (RMB Million) |
---|---|---|
Jiangsu Province | ||
Suzhou Methane-to-energy Project Phase I | 18,000,000 | 28 |
Suzhou Methane-to-energy Project Phase II | 9,000,000 | 13 |
Suzhou Methane-to-energy Project Phase I and II have a combined annual electricity generation capacity of 27,000,000 kWh. It collects methane produced from waste landfill sites for electricity generation. The project also utilises the high temperatures and residual heat from the gas. It is the first Verified Emission Reduction (VER) project in China that has registered with the Switzerland-based Gold Standard Foundation.
在建項目
籌建項目